Link to BPA Home Page
Link to BPA Home PageEFW - Salmon Swimming UpriverEFW - Forest, Evening SkyEFW - Deer in River
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Environmental Services Triangle Bullet Point NEPA Planning and Review Documents Triangle Bullet Point Shepherds Flat Wind Farm
Triangle bullet pointEnvironmental Policies and Planning

Triangle bullet pointProtecting and Recovering Endangered Species

Triangle bullet pointProtecting and Preserving Cultural Resources

Triangle bullet pointReducing Pollution and Managing Environmental Hazards

Triangle bullet pointEnvironmental Management System

Triangle bullet pointNEPA Categorical Exclusions

Triangle bullet pointNEPA Planning and Review Documents


BPA Interconnection of the Proposed Shepherds Flat Wind Farm
Gilliam & Morrow Counties, Oregon



  • PROJECT DESCRIPTION:


    BPA has been asked to interconnect up to 846 megawatts (MW) of electricity from the Shepherds Flat Wind Farm, a private energy facility, proposed in Gilliam and Morrow counties, Ore. The BPA interconnection facility would require constructing a new yard at an existing BPA substation in Gilliam County in 2008 and 2009. BPA does not propose to purchase any of the power produced by this wind project.

    Caithness Shepherds Flat, LLC would develop the wind project on privately owned grazing and farming land near the town of Arlington. The wind project would be developed in phases, with the eventual installation of up to 303 3.0 MW turbines. Two transmission lines would be constructed between the wind project and the BPA interconnection site.

    The wind project must go through Oregon Energy Facilities Siting Council (EFSC) review in order to obtain a site certification. The developer, through the EFSC Site Certificate Application process, has conducted environmental studies for the proposed wind project and associated facilities and is in the final stages of Siting Council review.

  • CURRENT STATUS:


    The BPA interconnection project has completed the environmental review stage and is proceeding to construction. BPA issued a Record of Decision (ROD) under the National Environmental Policy Act (NEPA) on July 18, 2008. BPA believes the decision to interconnect the wind project is consistent with BPA's Business Plan ROD, August 1995 and Business Plan Environmental Impact Statement (EIS), June 1995.

  • PUBLIC MEETINGS:


    BPA held a scoping meeting on October 25, 2006. The comment period is now closed.

  • COMMENTS:


    If you would like to be on the project mail list please send your name and mailing address to Bonneville Power Administration, Communications - DKC-7, P.O. Box 14428, Portland, OR 97293-4428 or FAX it to 503-230-3285 or send it to the BPA Public Comment page by clicking here.

  • CONTACT:


    Douglas F. Corkran, Environmental Specialist, Bonneville Power Administration - KEC-4, P.O. Box 3621, Portland, Oregon, 97208-3621; direct telephone number 503-230-7646; toll-free telephone number 1-800-282-3713; fax number 503-230-5699; e-mail address: dfcorkran@bpa.gov.

  • DOCUMENTS:




If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

 Page last reviewed on 2/14/2006 4:46:23 PM