Link to BPA Home Page
Link to BPA Home PageEFW - Salmon Swimming UpriverEFW - Forest, Evening SkyEFW - Deer in River
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Keeler to Tillamook Transmission Line Rebuild (DOE/EA-1931)
Triangle bullet pointEnvironmental Policies and Planning

Triangle bullet pointProtecting and Recovering Endangered Species

Triangle bullet pointProtecting and Preserving Cultural Resources

Triangle bullet pointPollution Prevention and Abatement

Triangle bullet pointEnvironmental Management System

Triangle bullet pointNEPA Categorical Exclusions

Triangle bullet pointNEPA Planning and Review Documents


Keeler to Tillamook Transmission Line Rebuild (DOE/EA-1931)


Washington and Tillamook counties, Oregon

  • PROJECT DESCRIPTION:

    BPA has made the decision to rebuild the Keeler to Tillamook 115-kilovolt (kV) transmission line. The 58 mile long wood-pole line extends from Hillsboro to Tillamook, Oregon. Based on the final environmental assessment (EA), BPA is issuing a finding of no significant impact (FONSI) and has made a decision to proceed with the project. The rebuild includes replacement of all wood-pole structures over 10 years in age, including cross arms, cross braces, guy wires, anchors, insulator assemblies, switches, and overhead conductor. The rebuild will enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line will continue to operate at 115-kV.

  • CURRENT STATUS:

    BPA decided to rebuild the Keeler to Tillamook transmission lines based on the final EA and FONSI. The final EA includes a mitigation action plan that outlines the mitigation measures that are being implemented. Construction is planned to begin in April 2014 and will be completed in January 2015.

  • CONTACT:


  • For environmental-related information, contact:
    Zachary Gustafson
    Contract Environmental Protection Specialist
    David Evans Associates
    Bonneville Power Administration - KEC-4
    P.O. Box 3621
    Portland, OR 97208-36211

    Direct line:
    Toll-free:
    Email:

    503-230-7312
    800-282-3713
    zrgustafson@bpa.gov

    For project information, contact:
    Nathan Mullen
    Project Manager

    Bonneville Power Administration - TEP-TPP-1
    P.O. Box 61409
    Vancouver, WA 98666-1409
    Toll-free:
    Direct line:
    Email:
    800-282-3713
    360-619-6302
    ndmullen@bpa.gov

  • DOCUMENTS:


    (All documents are in pdf format)

    Meet the Contractor Letter (24 Kb) (03/21/2014)
    Keeler to Tillamook Outage Map (2.4 Mb) (12/11/2013)

    FINAL EA / FONSI:


    Public Letter (33 Kb) (02/21/2014)
    Final EA (2.3 Mb) (02/06/2014)
    FONSI and Mitigation Action Plan (231 Kb) (February 2014)

    DRAFT EA:


    Public Letter (32 Kb) (11/01/2013)
    Draft EA (11.2 Mb) (October 2013)
    Project Map (534 Kb) (08/09/2012)
    Comment Form (20 Kb) (11/01/2013)

    SCOPING


    Public Letter (32 Kb) (08/20/2012)
    Comment Form (18 Kb) (08/20/2012)
    Project Map (534 Kb) (08/20/2012)

    Determination Memo (31 Kb) (07/17/2012)


If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

 Page last reviewed on 11/13/2013 3:46:34 PM