BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Kalispell-Kerr Transmission Line Rebuild (DOE/EA-1961)
Triangle bullet pointEnvironmental Policies and Planning

Triangle bullet pointProtecting and Recovering Endangered Species

Triangle bullet pointProtecting and Preserving Cultural Resources

Triangle bullet pointPollution Prevention and Abatement

Triangle bullet pointEnvironmental Management System

Triangle bullet pointNEPA Categorical Exclusions

Triangle bullet pointNEPA Planning and Review Documents


Kalispell-Kerr Transmission Line Rebuild (DOE/EA-1961)


Flathead and Lake counties, Montana

  • PROJECT DESCRIPTION:


    Bonneville Power Administration (BPA) proposes to rebuild the Kalispell-Kerr 115-kilovolt (kV) transmission line in
    Flathead and Lake counties, Montana. This 41-mile long transmission line is owned and operated by BPA. The line
    begins at the BPA Kalispell Substation and ends at the BPA Kerr Substation, approximately 4 miles southwest of the city
    of Polson (see project map below). The rebuild is needed because the transmission line, which was built in 1947, is old and the existing wood-pole structures and electrical wires (conductors) show normal deterioration due to age. Rebuilding this transmission line would enable BPA to continue to provide reliable electric power to local utilities.

    The project would include replacing wood-pole transmission structures, associated structural components, and conductors. The wood-pole transmission structures consist of either two or three wood poles. The existing structures would be replaced with structures of similar design within or near to their existing locations. Some existing access roads would need to be improved to provide construction access and some new access roads may be needed to access structures for which BPA currently does not have adequate access. The rebuilt transmission line would continue to operate at 115-kV.

  • CURRENT STATUS:


    A letter about the project was sent to adjacent landowners, Tribes, government agencies, and other potentially affected or concerned interest groups. Public meetings were held June 17 and 18, 2013, and the public comment period ended June 28, 2013. Field work will be taking place to help BPA determine what natural resources may be affected by the proposed project.

    A preliminary environmental assessment (EA) is being drafted to identify potential impacts to the natural and human environment from the proposed project and will be released for public comment in 2014. Based on the analysis in the EA and comments received, BPA will prepare either a finding of no significant impact (FONSI) and decide whether to proceed with the project, or an environmental impact statement (EIS) if there is the potential for significant environmental impacts. Project road design is currently being developed.

  • COMMENTS:


    The comment period is now closed. Comments received for the project can be viewed at the Kalispell-Kerr Transmission Line Rebuild comments webpage. Comments, and responses to them, will be made part of the EA.

  • CONTACT:


  • For environmental-related information, contact:
    Justin Moffett, Environmental Lead
    Bonneville Power Administration - KEC-4
    P.O. Box 3621
    Portland, OR 97208-3621

    Toll-free:
    Direct line:
    FAX:
    Email:

    800-282-3713
    503-230-3233
    503-230-5699
    jtmoffett@bpa.gov

    For project information, contact:
    Amanda Williams, Project Manager
    Bonneville Power Administration - TEP-TPP-1
    P.O. Box 61409
    Vancouver, WA 98666-1409

    Toll-free:
    Direct line:
    FAX:
    Email:

    800-282-3713
    360-619-6634
    360-619-6021
    amloran@bpa.gov

  • DOCUMENTS:


    (All documents are in pdf format)

    SCOPING
    Public Letter (31 Kb) (05/28/2013)
    Comment Form (20 Kb) (05/28/2013)
    Project Map (463 Kb) (05/09/2013)

    EA Determination Memo (27Kb) (04/05/2013)


If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

 Page last reviewed on 7/19/2013 1:58:38 PM