Link to BPA Home Page
Link to BPA Home PageEFW - Salmon Swimming UpriverEFW - Forest, Evening SkyEFW - Deer in River
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Environmental Services Triangle Bullet Point NEPA Planning and Review Documents Triangle Bullet Point Juniper Canyon I Wind Project
Triangle bullet pointEnvironmental Policies and Planning

Triangle bullet pointProtecting and Recovering Endangered Species

Triangle bullet pointProtecting and Preserving Cultural Resources

Triangle bullet pointPollution Prevention and Abatement

Triangle bullet pointEnvironmental Management System

Triangle bullet pointNEPA Categorical Exclusions

Triangle bullet pointNEPA Planning and Review Documents


Juniper Canyon I Wind Project
Klickitat County, Washington



  • PROJECT DESCRIPTION:


    Pacific Wind Development (Pacific Wind), a wholly owned subsidiary of Iberdrola Renewables, Inc. submitted a request to BPA for interconnection of up to 150 megawatts (MW) of power generated from the proposed Juniper Canyon I Wind Project located in Klickitat County, Washington into the Federal Columbia River Transmission System (FCRTS). Pacific Wind will independently build, own, and operate the Wind Project and its associated facilities, including a transmission line to the proposed point of interconnection at BPA's Rock Creek substation. A final Environmental Impact Statement that addressed impacts of the entire Wind Project was released by Klickitat County on January 15, 2010. Klickitat County approved the Energy Overlay Zone permit for the project on February 12, 2010.

    To interconnect the Wind Project, BPA will expand its Rock Creek substation yard within BPA's property boundary by approximately 100 feet by 65 feet and install a new 230-kV terminal. BPA also will install new metering and communications equipment in the existing Rock Creek substation control house, as well as in the Wind Project substation.

  • CURRENT STATUS:


    BPA has issued a tiered Record of Decision (ROD) approving the interconnection request, including expansion of the Rock Creek Substation to be completed in summer 2010. BPA believes the decision to interconnect the wind project is consistent with BPA's Business Plan ROD, August 1995 and Business Plan Environmental Impact Statement (EIS), June 1995. As a result of the tiered ROD, BPA will offer contract terms for interconnection of 150 MW of power from the Wind Project into the FCRTS.

  • COMMENTS:


    All comments we receive on the project are posted in their entirety on the
    Juniper Canyon I Project comments page.

  • CONTACT:


    For further information on this project, please contact Makary Hutson, BPA Environmental Lead, at mahutson@bpa.gov.

  • DOCUMENTS:


    ROD Public Letter (28Kb pdf) (05/10/10)
    Record of Decision (118Kb pdf) (05/10/10)
    Public Scoping Letter (30Kb pdf) (12/30/09)
    Comment Form (40Kb pdf) (12/30/09)
    Project Vicinity Map (1.4MB pdf) (12/18/09)


If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

 Page last reviewed on 12/24/2009 11:05:08 AM