BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Hills Creek-Lookout Point Transmission Line Rebuild (DOE/EA-1967)
Triangle bullet pointEnvironmental Policies and Planning

Triangle bullet pointProtecting and Recovering Endangered Species

Triangle bullet pointProtecting and Preserving Cultural Resources

Triangle bullet pointPollution Prevention and Abatement

Triangle bullet pointEnvironmental Management System

Triangle bullet pointNEPA Categorical Exclusions

Triangle bullet pointNEPA Planning and Review Documents


Hills Creek-Lookout Point Transmission Line Rebuild (DOE/EA-1967)


Lane County, Oregon


  • PROJECT DESCRIPTION:

    BPA is proposing to rebuild its 26-mile long 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line generally located between Lowell and Oakridge, in Lane County, Oregon. The existing wood-pole line was constructed in 1953 and most of the structures are now physically worn. Based on its deteriorated condition, the line needs to be rebuilt in order to maintain reliable electrical service, avoid risks to the public, and ensure worker safety.

    The project would include replacing all wood-pole structures and conductor (wires) and improving access roads. Most structures would be replaced with similar size poles in the same locations unless changes are needed for safety or to minimize potential environmental impacts. Access roads would be improved and new access roads or trails may need to be acquired or developed. The transmission line would continue to operate at 115-kV.

  • CURRENT STATUS:

    To understand the potential environmental impacts of this proposal, BPA will prepare an environmental assessment (EA) following the procedures of the National Environmental Policy Act (NEPA). The EA will study the line rebuild, as well as a no-action alternative in which the line is not rebuilt and current maintenance practices continue. The EA will describe anticipated impacts to natural and human resources and include mitigation measures that would help avoid or minimize impacts. During this process, BPA will work with landowners, tribes, federal, state and local agencies, and interest groups.

  • COMMENTS:

    An open-house public meeting was in Oakridge, Oregon on September 11, 2013. The comment period closed on September 26, 2013. Comments are available for viewing in their entirety on the Hills Creek-Lookout Point comments webpage.

  • CONTACT:


  • For environmental information, contact:
    Justin Moffett
    Environmental Protection Specialist
    Bonneville Power Administration - KEC-4
    P.O. Box 3621
    Portland, OR 97208-3621

    Toll-free:
    Direct line:
    Email:

    800-282-3713
    503-230-3233
    jtmoffett@bpa.gov

    For project information, contact:
    Nathan Mullen
    Project Manager

    Bonneville Power Administration - TEP-TPP-1
    P.O. Box 61409
    Vancouver, WA 98666-1409

    Toll-free:
    Direct line:
    Email:


    800-282-3713
    360-619-6302
    ndmullen@bpa.gov


  • DOCUMENTS:


    (All documents are in pdf format)

    SCOPING
    Scoping comments received
    Public Letter (36 Kb) (08/23/2013)
    Project Map (282 Kb) (07/26/2013)
    Comment Form (21 Kb) (08/23/2013)

    EA Determination Memo (57 Kb) (06/10/2013)



If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

 Page last reviewed on 9/24/2013 4:28:49 PM