COB Energy Facility Interconnection
Klamath County, Oregon
PROJECT DESCRIPTION:
To interconnect the proposed COB Energy Facility (Peoples Energy Resources Corp.). The 1200 MW combustion turbine project would be constructed in two 600 MW phases at a site near Bonanza, Oregon. Phase I is scheduled to energize in June 2004. The project is subject to the Oregon Energy Facility Site Certification (EFSC) process managed by the Oregon Office of Energy (OOE).
CURRENT STATUS:
The final Environmental Impact Statement (EIS) and Record of Decision are available [see DOCUMENTS below].
CONTACT:
For further information on this project, please contact Thomas C. McKinney, BPA Environmental Lead.
DOCUMENTS:
ROD (134Kb pdf) (08/20/04)
Final EIS (Complete) (1.63MB) (June 2004)
Public Letter (131Kb pdf) (01/13/04)
Draft EIS (Table of Contents) (November 2003)
Notice of Intent - Letter w/attachment (40Kb pdf) (12/21/01)
|