Link to BPA Home Page
Link to BPA Home PageEFW - Salmon Swimming UpriverEFW - Forest, Evening SkyEFW - Deer in River
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Boyer-Tillamook Access Road Improvement Project (DOE/EA-1941)
Triangle bullet pointEnvironmental Policies and Planning

Triangle bullet pointProtecting and Recovering Endangered Species

Triangle bullet pointProtecting and Preserving Cultural Resources

Triangle bullet pointPollution Prevention and Abatement

Triangle bullet pointEnvironmental Management System

Triangle bullet pointNEPA Categorical Exclusions

Triangle bullet pointNEPA Planning and Review Documents


Boyer-Tillamook Access Road Improvement Project (DOE/EA-1941)


Tillamook and Yamhill counties, Oregon

  • PROJECT DESCRIPTION:


    BPA has made the decision to improve about 13.5 miles of access roads along the existing Boyer-Tillamook transmission line in Tillamook and Yamhill counties, Oregon. Based on the final environmental assessment (EA), BPA is issuing a finding of no significant impact (FONSI) and has made a decision to proceed with the project.

    The road improvements are needed because the existing access roads for this transmission line are in poor condition. Access road improvements will include resurfacing roads, upgrading drainage and stream crossings, road widening and adding a small amount of new road.


  • CURRENT STATUS


    The final EA, FONSI, and mitigation action plan are available below. If you would like to receive a copy, please call our toll-free document request line at 1-800-622-4519, providing the full project name, your name and complete mailing address.

  • CONTACT:


  • For environmental information, contact:
    Gene Lynard, Supervisory Environmental Protection Specialist
    Bonneville Power Administration - KEC-4
    P.O. Box 3621
    Portland, OR 97208-3621

    Toll-free:
    Direct line:
    Email:


    800-282-3713
    503-230-3790
    gplynard@bpa.gov


    For project information, contact:
    Jim Semrau, Project Manager
    Bonneville Power Administration - TEP-TPP-1
    P.O. Box 61409
    Vancouver, WA 98666-1409

    Toll-free:
    Direct line:
    Email:


    800-282-3713
    360-619-6629
    jesemrau@bpa.gov


  • DOCUMENTS:


    (All documents are in pdf format)

    FINAL EA / FONSI / Mitigation Action Plan:
    Public Letter (29 Kb) (01/24/2014)
    Final EA (3,411 Kb) (01/13/2014)
    FONSI and Mitigation Action Plan (625 Kb) (01/13/2014)

    PRELIMINARY EA
    Preliminary EA comments received
    Public Letter (30 Kb) (09/13/2013)
    Preliminary EA (16 MB) (September 2013)
    Comment Form (35 Kb) (09/13/2013)

    SCOPING
    Scoping comments received
    Public Letter (33 Kb) (03/05/13)
    Comment Form (29 Kb) (03/05/13)
    Project Vicinity Map (2.6 MB) (02/06/13)




If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

 Page last reviewed on 10/18/2013 4:53:41 PM