Link to BPA Home Page
Link to BPA Home PageEFW - Salmon Swimming UpriverEFW - Forest, Evening SkyEFW - Deer in River
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Information for Contractors Triangle Bullet Point Statements of Work/Work Elements Triangle Bullet Point Hatchery Operations and Maintenance (O&M) Triangle Bullet Point Spawn Fish
Triangle bullet pointUsing Pisces

Triangle bullet pointStatements of Work/Work Elements

Triangle bullet pointProject and Contract Budgets

Triangle bullet pointReporting Requirements

Triangle bullet pointContract Checklist

Triangle bullet pointContract Changes

Triangle bullet pointReport Center


Spawn Fish


This work element is expired. Work to spawn fish will now be a milestone under WE# 176, Produce Hatchery Fish.
[09/30/2010]

Hatchery O&M

64



Definition
table top
Contact
Jonathan McCloud
(503) 230-3509
table bottom
Includes work performed under contracts solely for spawning of adult fish. If the full range of hatchery fish culture activities is performed under a contract, use WE#176, Produce Hatchery Fish.
Deliverables (recommended)
  • Number and species spawned, spawning location
Rules and Examples (work element scenarios and associated rules)
Rule 1: Any ESA, NEPA, permitting, or other environmental compliance work should be split out under WE# 165, Produce Environmental Compliance Documentation. Also, operations and maintenance (O&M) costs should be split out under WE# 61, Maintain Hatchery.
Example:

WE: Spawn fish
WE Title: Spawn BY2008 spring Chinook at Elk Creek facility.
WE Description: Approximately 80 fish (40 male, 40 female) will be spawned to produce 200,000 fertilized eggs.

WE: Produce Environmental Compliance Documentation
WE Title: Permits and ESA Compliance for Fish Spawning Operation
WE Description: Obtain local permits and ESA compliance associated with the spawning operations.
Rule 2: If multiple species and/or brood years are spawned, you must use separate work elements for each species and brood year, since the metrics for each need to be reported separately.
Example:

WE: Spawn Fish
WE Title: Spawn BY2008 spring Chinook at the Elk Creek spawning facility.
WE Description: Approximately 80 fish (40 male, 40 female) will be spawned to produce 200,000 fertilized eggs.

WE: Spawn Fish
WE Title: Spawn BY2009 spring Chinook at the Elk Creek spawning facility.
WE Description: Approximately 80 fish (40 male, 40 female) will be spawned to produce 200,000 fertilized eggs.

WE: Spawn Fish
WE Title: Spawn BY2008 fall Chinook at the Elk Creek spawning facility.
WE Description: Approximately 260 fish (130 male, 130 female) will be spawned to produce 500,000 fertilized eggs.
Milestones (may include)

  • Environmental compliance requirements complete
  • On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
  • Spawning - dates
  • Sort fish for maturation

Metrics

    No metrics needed for this work element.


Location Guidance

    Identify point where fish were spawned.

Environmental Compliance

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in Pisces in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in Pisces, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.
  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.
  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.
  • Public Involvement
    Public involvement is typically required for this work element. The contractor should work with BPA Environmental staff to document previous or ongoing outreach efforts associated with this work or to develop a public involvement plan.

  • Associated Work Elements
    • If the full range of fish culture activities is done under a hatchery contract, spawning fish would be covered under WE# 176, Produce Hatchery Fish.
    • If a hatchery O&M contract involves only one or two fish culture activities such as trapping/collecting/holding fish or acclimation of juvenile fish, one or more of these specific work elements may be used, as appropriate: WE# 66, Trap/Collect/Hold/Transport Fish - Hatchery; WE# 59, Incubate Eggs; WE# 63, Rear Fish; WE# 56, Acclimate Juvenile Fish; WE# 60, Maintain Fish Health.
    • Maintenance of a spawning facility is covered under WE# 61, Maintain Hatchery.
    • Any use of WE# 64 Spawn Fish requires an annual production plan for those fish. Use WE# 174 Produce Plan ? Hatchery Production Plan to cover work to develop this plan. The plan will cover all species reared under this WE. For each species, where applicable, the plan will include a forecast for the next adult return and the number retained for broodstock, disposition of excess fish, assumptions about survival between life stages, number of individuals to be released at each lifestage, transportation, and acclimation plans, etc. The plan will be provided electronically to comanagers and attached in Pisces to the contract under which the fish are reared. For contracts that also include WE# 61 Maintain Hatchery, where an annual maintenance plan is required, the annual production plan(s) and the maintenance plan may be combined into a single document titled "Annual Operating Plan" (AOP).
    • All put and take fishery work is covered under WE# 187, Put and Take Fisheries.



    If you believe information on this site is missing or in error, please Submit that comment here.
    NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

     Page last reviewed on 5/25/2010 3:34:02 PM