Link to BPA Home Page
Link to BPA Home PageEFW - Salmon Swimming UpriverEFW - Forest, Evening SkyEFW - Deer in River
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Replace/Maintain Instream Structure
Triangle bullet pointUsing Pisces

Triangle bullet pointStatements of Work/Work Elements

Triangle bullet pointProject and Contract Budgets

Triangle bullet pointReporting Requirements

Triangle bullet pointContract Checklist

Triangle bullet pointContract Changes

Triangle bullet pointReport Center


Replace/Maintain Instream Structure


This work element is expired.
Please use WE# 186, Operate and Maintain Habitat/Passage. [11/23/2004]

Habitat/Passage O&M

19



Definition
table top
Contact
Gerald McClintock
(503) 230-5375
table bottom
Any activity aimed at replacing or maintaining the use of past installed structures. Maintenance includes adjusting structures moved during high flows or other events, and modifying existing structures to ensure that they continue to provide benefit.
Deliverables (recommended)
  • Replaced and/or maintained:
    • large woody debris
    • boulders
    • J-hooks
    • barbs
    • cross veins
    • toe rocks
    • rootwad revetments
    • weirs
Rules and Examples (work element scenarios and associated rules)
Rule 1: Any significant ESA, NEPA, permitting, or other environmental compliance work should be split out under WE# 165, Produce Environmental Compliance Documentation.
Example:

WE: Replace/Maintain Instream Structure
WE Title: Replace large woody debris between RM 38 and RM 42 on the McCloud River.

WE: Produce Environmental Compliance Documentation
WE Title: Obtain local permits and ESA compliance associated with replacing large woody debris on the McCloud River.
Rule 2: If you are replacing and/or maintaining instream structures at multiple locations, you may lump these under a single work element. However, you may wish to break the work into separate work elements if it provides clarity or better supports project management.
Example:

Option 1 (lumping)

WE: Replace/Maintain Instream Structure
WE Title: Replace large woody debris between RM 13 and RM 16, RM 22 and RM 27, and RM 38 and RM 42 on the McCloud River.

Option 2 (splitting)

WE: Replace/Maintain Instream Structure
WE Title: Replace/maintain large woody debris between RM 13 and RM 16 on Newport River.

WE: Replace/Maintain Instream Structure
WE Title: Replace/maintain large woody debris between RM 22 and RM 27 on Sandy River.

WE: Replace/Maintain Instream Structure
WE Title: Replace/maintain large woody debris between RM 38 and RM 42 on Seth Creek.
Milestones (may include)

  • Inspection, replacement and/or maintenance of large woody debris
  • Inspection, replacement and/or maintenance of boulders
  • Inspection, replacement and/or maintenance of J-hooks
  • Inspection, replacement and/or maintenance of barbs
  • Inspection, replacement and/or maintenance of cross veins
  • Inspection, replacement and/or maintenance of toe rocks
  • Inspection, replacement and/or maintenance of rootwad revetments
  • Inspection, replacement and/or maintenance of weirs

Metrics

    No metrics needed for this work element.


Location Guidance

Environmental Compliance

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in Pisces in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in Pisces, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.
  • Endangered Species Act (ESA)
    ESA consultation is typically not required for this work element.
  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.
  • Public Involvement
    Public involvement is typically not required for this work element.

  • Associated Work Elements


    If you believe information on this site is missing or in error, please Submit that comment here.
    NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

     Page last reviewed on 4/14/2010 12:41:49 PM