Link to BPA Home Page
Link to BPA Home PageEFW - Salmon Swimming UpriverEFW - Forest, Evening SkyEFW - Deer in River
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Information for Contractors Triangle Bullet Point Statements of Work/Work Elements Triangle Bullet Point BPA Internal Operations Triangle Bullet Point Land Audit
Triangle bullet pointUsing Pisces

Triangle bullet pointStatements of Work/Work Elements

Triangle bullet pointProject and Contract Budgets

Triangle bullet pointReporting Requirements

Triangle bullet pointContract Checklist

Triangle bullet pointContract Changes

Triangle bullet pointReport Center


Land Audit


This work element is expired.
Please capture any land audit work as a milestone under WE# 5, Land Purchase. [03/05/2007]

BPA Internal Operations

4



Definition
table top
Contact
Gerald McClintock
(503) 230-5375
table bottom
This is a BPA Internal-use only Work Element. BPA uses this work element to cover the hazardous material/Phase 1 work performed by BPA's Pollution Prevention and Abatement group, usually in support of land acquisitions.

Metrics

    No metrics needed for this work element.


Location Guidance

    Identify point at approximate center of parcel where Land Audit took place. The location point must be the same for all associated TBL Work, Conduct Pre-Acquisition Activities, Land Purchase, and Prepare HEP Report work elements. If an associated work element and its location are already in Pisces, click the "Link" button to synchronize locations. If not, enter a location and location description for this work element to enable future linking. You may enter or link more than one point for this work element.

Environmental Compliance

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in Pisces in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in Pisces, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.
  • Endangered Species Act (ESA)
    ESA consultation is typically not required for this work element.
  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.
  • Public Involvement
    Public involvement is typically not required for this work element.




  • If you believe information on this site is missing or in error, please Submit that comment here.
    NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

     Page last reviewed on 4/14/2010 12:41:49 PM