Link to BPA Home Page
Link to BPA Home PageEFW - Salmon Swimming UpriverEFW - Forest, Evening SkyEFW - Deer in River
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Information for Contractors Triangle Bullet Point Statements of Work/Work Elements Triangle Bullet Point Reporting
Triangle bullet pointUsing Pisces

Triangle bullet pointStatements of Work/Work Elements

Triangle bullet pointProject and Contract Budgets

Triangle bullet pointReporting Requirements

Triangle bullet pointContract Checklist

Triangle bullet pointContract Changes

Triangle bullet pointReport Center


Reporting



The "Reporting" work category includes reporting associated with a Fish and Wildlife program contract, including monthly status reports, annual reports, metrics collection, and journal articles for peer review.

Reporting requirements vary depending upon the type of contract. At a minimum, all contracts are required to do some financial and progress reporting, and thus will have at least one "Reporting" Work Element in their Statement of Work. If you are creating a technical report, please follow the guidelines for submitting technical reports and publications (PDF).

Note Information for work elements is now available at http://www.cbfish.org/WorkElement.mvc/Index. Links below to specific work element background pages will take you directly to the cbfish.org pages.

The Reporting work elements are:
132. Produce (Annual) Progress Report
141. Produce Other Report
183. Produce Journal Article
185. Produce Pisces Status Report

See all Fish and Wildlife program work elements (PDF)


If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

 Page last reviewed on 6/18/2008 2:22:18 PM